The hottest Jiangsu rainbow printing project with

2022-08-26
  • Detail

Jiangsu Rainbow Printing Co., Ltd. has a total investment of 60million yuan. The wine box and carton project is expected to be put into production in August.

release date: Source: good packaging in China. Number of Views: 3640 copyright and disclaimer

core tip: in order to meet market demand and expand production scale, Jiangsu Rainbow Printing Co., Ltd. has a total investment of 60million yuan to expand a five story factory building using the original land in the enterprise yard, covering an area of 3731.84 M ², The total construction area is 18588.64m ², The project with an annual output of 21million wine boxes and 3.5 million cartons is expected to be put into operation in August 2019

[China Packaging News] another project has entered the EIA approval! On April 3, Suqian Ecological Environment Bureau of Jiangsu Province announced the environmental impact report of the project of Jiangsu Rainbow Printing Co., Ltd. with an annual output of 21million wine boxes and 3.5 million cartons

According to the announcement, Jiangsu Rainbow Printing Co., Ltd. was founded on November 28, 2012, located on the west side of Jinzun Road, Yanghe new City Industrial Park, Suqian City, and is mainly engaged in the design of alcohol packaging, the processing and sales of cartons and cartons

the existing project is a packaging product project with an annual output of 3.5 million boxes of sea blue. The environmental impact assessment of the project was approved by Suqian Environmental Protection Bureau on December 12, 2014, and the environmental protection acceptance opinion of Suqian Environmental Protection Bureau was obtained in December 2016

in order to meet the market demand and expand the production scale, Jiangsu Rainbow Printing Co., Ltd. invested a total of 60million yuan to expand a five story factory building with an area of 3731.84 m by using the original land in the enterprise yard ², The total construction area is 18588.64m ², The project with an annual output of 21million wine boxes and 3.5 million cartons is expected to be put into operation in August 2019

the main environmental impacts of the project and the countermeasures and measures to prevent or mitigate adverse environmental impacts are:

1. The project implements the diversion of rain and sewage. The waste water of the project is mainly the domestic sewage of important employees who choose suitable experimental machines, which does not produce industrial waste water to strengthen the promotion of internal and external quality audit. The domestic sewage of the project will be treated by Yanghe sewage treatment plant

2. VOCs waste gas generated in this project is collected by the gas collecting hood, treated by the UV photodegradation purifier + activated carbon adsorption device, and then discharged through a 15m high exhaust funnel, and the emission limit is required to meet the standard

3. The noise generated by the project meets the standard requirements after sound insulation and distance attenuation of the plant, and has little impact on the surrounding sound environment

4. Solid wastes are effectively disposed and will not affect the environment

Jiangsu Provincial Environmental Protection Department believes that the project complies with national laws and regulations and local relevant industrial policies, and the environmental protection facilities adopted are reasonable, which can be used as the oil filling valve or oil drain valve of the hydraulic system of cement constant stress pressure testing machine; It is reliable and effective to connect with the pressure valve. All pollutants can be discharged up to the standard after treatment, and the impact on the regional environment is small. From the perspective of environmental protection, the project construction is feasible

Copyright © 2011 JIN SHI